Home / Services / Due date tracking

Due date tracking

One list for every truck and every date that matters. When a job is done the date resets. Before one runs out, you hear about it.

The basics

What it is

Every unit. Every date. One place.

One list for every truck and every date that matters. Each unit has its own line: the DOT annual, the aerial periodic inspection, the dielectric test, the crane annual, the next service, and the small gear with its own clock. When a job is done, the report is filed against the unit and the date resets. Before a date runs out, the person you name gets a reminder.

We build the list from the rules and the maker's manuals, then check it against the paper reports you hand over. The dates are only as good as the reports behind them, and we say so when one is missing.

The report is the proof. The list is how you remember to get it.

The point

Why it matters

Missing a date is a surprise you pay for.

One missed date does real damage. A carrier that does not perform the annual properly is subject to penalty under 49 U.S.C. 521(b). Maker engineers say a unit with no periodic dielectric test in the past 12 months can no longer be considered insulating. A bucket truck that cannot work near a line is a bucket truck that cannot take the storm call.

Dates also bunch up. A fleet that bought five trucks in one month will have five annuals in one month, every year. A tracked list shows it ahead of time so the due dates can be spread out.

The list does not move the responsibility. The owner and the motor carrier still own the inspections and the records. The list is a tool to keep that from slipping.

Who it is for

Who needs it

If the dates live in somebody's head, they will walk out with them.

  • Fleets running on folders and memory
  • A spreadsheet that only one person understands
  • A fleet that just bought another company
  • Contractors who show records to customers
  • Owners with mixed equipment: buckets, derricks, cranes and semis
  • Anyone who found an expired sticker the day before a job

The list

What is included

Eleven kinds of dates, by unit.

Dates we track per unit, with the rule behind each
WhatIntervalWhere it comes from
DOT annual inspectionPassed at least once in the preceding 12 months. Report kept 14 months.49 CFR 396.17 and 396.21
Aerial device periodic inspectionEvery 1 to 12 months, set by the ownerANSI A92.2
Dielectric periodic testAnnual for most classes of machine, and after repairs to the insulating section. Category A in barehand work is tighter.ANSI A92.2, ANSI A10.31, maker guidance
Digger derrick periodic inspectionEvery 1 to 12 months, owner and maker setANSI A10.31
Crane and boom truck inspectionEach shift, monthly (documented) and at least every 12 monthsOSHA 1926.1412
Major structural inspectionAfter 15 years of service, then every 10 yearsANSI A92.2-2021
Live-line tools used for primary protectionOut of service every 2 years for exam and testOSHA 1910.269(j) and 1926.957
Rubber insulating glovesEvery 6 monthsOSHA 1910.137
Rubber insulating blankets and sleevesEvery 12 monthsOSHA 1910.137
Preventive maintenanceBy hours, miles or months, set by the makerMaker's manual
Wheel torque re-checkAfter a wheel is mountedWheel maker; fleet guidelines

Intervals are the common ones. If your maker, customer or policy asks for shorter, the shorter date goes on the list. Where a rule says "set by the owner," we ask you what you want and write it down.

Reminders

How often

A reminder is only useful early.

  • You choose the lead timeInspections and tests need to be booked, so they get longer notice than an oil change. We set a default for each item type with you and change it when you want.
  • Before it runs out, not afterThe point is a date you can still act on. A reminder the week of is a scramble.
  • Bundled where the dates allowWe look for units in the same yard with dates close together, so one crew visit covers them. That saves trips.
  • Updated when the work is doneA completed job resets the date and files the report. If the report is missing, the item stays open.

The rulebook

Standards the work follows

Every date on the list has a rule or a manual behind it.

  • 49 CFR 396.17, 396.21, 396.3The DOT annual, its report and 14 month retention, and the maintenance record with a way to show what is due and when.
  • ANSI/SAIA A92.2 and ANSI/ASSP A10.31Frequent, periodic, major structural and post-event inspections, and the dielectric tests for insulating units.
  • OSHA 1926.1412Crane inspections: each shift, monthly, annual, and after repair or modification.
  • OSHA 1910.269(j), 1926.957 and 1910.137Live-line tool and rubber insulating gear test and removal intervals.
  • Maker's manualsThe source for PM and the shorter intervals.

The route

How a job goes with Convoy

We keep the list and we book the work.

  1. Send the unit list

    Unit number, make, model, serial number or VIN, equipment, and every date and report you have.

  2. We set the dates

    We work out what each unit needs and when it is due, from the rules and the manuals. Gaps in the paper get flagged.

  3. Reminders go out

    To whoever you name, at the lead time you pick. Jobs get booked for you, bundled by yard where we can.

  4. Close it out

    The report is filed, the date resets, and the list is current again.

The paperwork

What you get back

The list, and the reports behind it.

Fleet due date listConvoy Fleet Services
  • A list by unit: every item, the last date done, the next date due
  • A look-ahead of what is coming due and when
  • The report for each completed job, filed against the unit
  • History per unit, so a customer or inspector can see it at a glance
  • A flag on anything overdue or missing a report
  • A short note on which dates are rules and which are the maker's or yours

Bring us the dates and reports you already have. They are only as good as the paper behind them, and we mark anything we have not seen.

Straight answers

Questions we get

If you want it, ask.

Do you track units you do not service?

Yes, if you give us the dates and the reports. We will mark which dates we have seen paper for and which we are taking on your word.

Does a reminder make you responsible?

No. The owner and the motor carrier are responsible for the inspections, tests and records. The list helps you keep up. It does not replace a qualified inspector or your own duty.

What do you need from me to start?

The unit list, and any reports and stickers you have: DOT annuals, aerial inspections, dielectric tests, crane records, service sheets. Photos of the ID plates help.

Can I set shorter intervals than the standard?

Yes, and many owners do for heavy use. The standard gives a window, and you can choose any date inside it. Tell us and we use yours.

What does it cost?

We quote with the first job. Send the unit list through the form and we will get back to you.

Need due date tracking? Get a quote.

Tell us what you run and where it sits. We come back with a price and a plan. A rough list is fine.

Get a quote